Search the forum,

Discuss Cracks bridging screed and blockwork in the Tiling on Underfloor Heating area at TilersForums.com.

We are currently at the planning stage for a floor with bifold windows and wet underfloor heating.

Basically the tiles near the windows will need to go over the screed and onto a concrete block on the perimeter (red arrows). I'm concerned that the screed with the insulation under it is likely to move (a little) and the concrete perimeter block will not - so we will end up with a crack line in any tiles we put over it (orange dotted line).

Is this actually a problem, and if so what do I do about it.

1688543439567.png


Thanks Simon
 

Reply to Cracks bridging screed and blockwork in the Tiling on Underfloor Heating area at TilersForums.com

There are similar tiling threads here

  • Question
I had a small leak in the main water line before the stop tap in my 1950s house. The copper pipe had worn away over the past 70 years, causing a small crack in the copper. A plumber/builder fixed...
Replies
1
Views
785

Advertisement

Top