I was hoping someone may be able to advise me on when we can lay down our tiles.
We poured a 60mm screed on February 14th with wet underfloor heating set inside.
After a waiting several weeks we tuned on the heating and have been waiting for the floor to be dry enough to lay down the ceramic tiles.
The moisture is still at about 8% and I am wanting to know if we can now lay down the tiles?
Does the floor have to be totally dry for the adhesive to set?
Any advise will be much appreciated.
We poured a 60mm screed on February 14th with wet underfloor heating set inside.
After a waiting several weeks we tuned on the heating and have been waiting for the floor to be dry enough to lay down the ceramic tiles.
The moisture is still at about 8% and I am wanting to know if we can now lay down the tiles?
Does the floor have to be totally dry for the adhesive to set?
Any advise will be much appreciated.