D
Deleted member 53943
Evening folks.
I’ll get straight to the point. Been to look at a job. Dining area / kitchen. Roughly 45m2
The contractor previous have installed underfloor heating and screeded it with a biscuit mix dry (7-1). The floor to me wants self levelling before anyone starts, it’s not bad for level but very bitty. Sweeping a brush creates a dust.. the client has said not to SBR it but if they want me to tile I’m insisting it’s done. Anyone every come across this and have any other ideas?.. (spray an SBR?)
Any help appreciated
H
I’ll get straight to the point. Been to look at a job. Dining area / kitchen. Roughly 45m2
The contractor previous have installed underfloor heating and screeded it with a biscuit mix dry (7-1). The floor to me wants self levelling before anyone starts, it’s not bad for level but very bitty. Sweeping a brush creates a dust.. the client has said not to SBR it but if they want me to tile I’m insisting it’s done. Anyone every come across this and have any other ideas?.. (spray an SBR?)
Any help appreciated
H