First time using this and it says it can be tiled on 24hours after application. I'm looking at it, it's firmed up but still has the wet look all around it. I was thinking maybe it would have dried out quicker than this or am I overthinking it.
I want to use green screed addy, bal red anti crack matting and tile the floor. I only have one bag for 3sq meters of tiling. Would this be enough needed if I'm installing the anti crack matting aswell! .