Discuss Tile moving and grout breaking in the Tiling on Underfloor Heating area at TilersForums.com.

Anthony

TF
Esteemed
Arms
Reaction score
18
Points
153
Location
Coventry
Someone has looked at it and said it is due to the primer not being put down. The tiler isn't taking any responsibility to the point of ignoring my calls. I am lost at this moment.
What can be done? The other guy mentioned epoxy grout as he thought the epoxy might hold the tiles stronger. The gap between the tiles is 2m which won't be enough to drill and pump fix a floor solution. What do you recon?
Hey Anthony, is it worth re-grouting or spreading epoxy over the tiles to hold them down before we start taking all of 100 sq m of tiles?
Hi.it’s a case of starting again. The tiles are effectively just sitting on top of the subfloor, the only thing holding them down is the weight of tile and the adhesive stuck to the back of them. There’s absolutely no point throwing more money at it with epoxy.
Sorry to hear of your agony.
 
Reaction score
3
Points
58
Location
Birmingham
Primer HAS to be used and an Anhydrite screed … end of and also more than one coat.. other questions : is the screed heated ? : How long had the screed been down ?.
Hi Dave, the screed was put down in end of May 2022. The screed is heated.
The primer looks like has been missed. What are my options now?
 
Reaction score
3
Points
58
Location
Birmingham
Hi.it’s a case of starting again. The tiles are effectively just sitting on top of the subfloor, the only thing holding them down is the weight of tile and the adhesive stuck to the back of them. There’s absolutely no point throwing more money at it with epoxy.
Sorry to hear of your agony.
Thanks for the advice Anthony. Appreciate it. I will see if I can get hold of the tiler and get him to correct this. I don't have much faith in if I would be able to. Can't even take him to some sort of court.
 

Dave

TF
Staff member
Esteemed
Arms
Subscribed
Reaction score
389,895
Points
1,000,000
Location
Co.Durham
Hi Dave, the screed was put down in end of May 2022. The screed is heated.
The primer looks like has been missed. What are my options now?
If it’s not primed, then it’s failed due to ettringite formation due to reaction with the cementitious based adhesive and the gypsum content of the screed. No other fix than a full rip out and prepping correctly will work. A full lack of knowledge by your tile installer.
 

Ajax123

TF
Esteemed
Arms
Reaction score
931
Points
1,213
Location
Lincolnshire
It is not possible on most ufh systems to increase the temperature by 1C. I’m interested to know how you achieved this?
 
Reaction score
3
Points
58
Location
Birmingham
It is not possible on most ufh systems to increase the temperature by 1C. I’m interested to know how you achieved this?
I have hive thermostat. Kept the thermostat on the tile, it gave me a temperature and then I set the target to 1 degree higher than what was displayed. Once it be hit the target it would automatically cut off heating. This was the method followed.
 
Reaction score
3
Points
58
Location
Birmingham
If it’s not primed, then it’s failed due to ettringite formation due to reaction with the cementitious based adhesive and the gypsum content of the screed. No other fix than a full rip out and prepping correctly will work. A full lack of knowledge by your tile installer.
hi @Dave so it seems like I need to get the work surveyed by a pro tiler, get a report of all what's wrong, get a quote of redoing the work and then confront the tiler with the facts. They are not picking my phone. So logically am thinking how can I get them to listen. Possibly send them a legal letter illustrating the case? What do you reckon?
 

Ajax123

TF
Esteemed
Arms
Reaction score
931
Points
1,213
Location
Lincolnshire
Your use of the room stat to control the temperature is an in appropriate way to do it. The flow temperature of the water within the screed is the important bit. That can only be controlled at the mixing valve or the boiler. That is why you cannot really control it as finely as 1C per day. Using the stat controls the room temp not the glow temp. My gut feeling is that the incoming temperature has been too high and has shocked the floor and that is the reason for the tiles popping.
 

Anthony

TF
Esteemed
Arms
Reaction score
18
Points
153
Location
Coventry
Your use of the room stat to control the temperature is an in appropriate way to do it. The flow temperature of the water within the screed is the important bit. That can only be controlled at the mixing valve or the boiler. That is why you cannot really control it as finely as 1C per day. Using the stat controls the room temp not the glow temp. My gut feeling is that the incoming temperature has been too high and has shocked the floor and that is the reason for the tiles popping.
Irrelevant! She’s established it’s not been primed. You don’t even need to have ufh for this to happen. It’s a chemical reaction between screed and cement!
 

Reply to Tile moving and grout breaking in the Tiling on Underfloor Heating area at TilersForums.com

There are similar tiling threads here

I had a small leak in the main water line before the stop tap in my 1950s house. The copper pipe...
Replies
1
Views
659
10 Tiling Tips for Fixing Tiles to Bathroom Walls = From UKTilingForum.co.uk There are a few...
Replies
1
Views
741
Hi! I'm looking for some advice, I have laid some SLC (Mapei 1210) in our conservatory in...
Replies
5
Views
629
    • Like
Bathroom floor. I would be grateful for advice on how to prepare my bathroom sub floor ready for...
Replies
1
Views
511
Good morning all. After a little advice. I'll post pictures a bit later. However.... The...
Replies
6
Views
905
Posting a tiling question to the forum? Post in Tilers' Talk if you are unsure which forum to post in. We'll move it if there's a more suitable forum.
Please visit our sponsor websites, they keep the forum free to use!

Advertisement

New Tiling Questions

Replies you've not seen

Top