I

icctiling

Hi all
been trying to think things through and help myself speed up when doing jobs......hoping someone can offer some good advice
after setting out and when you start to lay the tiles;
do you lay all the full tiles first then do the cuts?
On smaller jobs do you try to get the tiles down and grouted all within one day?
how long do you allow the tiles to set before grouting?
im a big guy and hate to disturb the tiles by walking on them and grouting before they've truly set.
on larger jobs throughout different rooms, do you tile and grout the full rooms one by one or lay all tiles then grout the full job.

Just want to get a feel for everyone's method of planning out a job, or maybe it's whatever works for each of us

Thanks everyone in advance
 

Simons70

TF
Esteemed
Arms
603
763
Luton
Personally I like to start from bottom.One line,go in the top.Never let the cut pieces after,lost more time.Start with the wall in front of the door.Finish one wall and start the next.Grout all you do next day if is possible,not let to grout more rooms,is more dirty when you finish the whole job.Keep clean your tools,your hands and put the rubbish in one adhesive bags.Anyway is too much to discuss,the speed arrived in time,try just to be there!
 

Andy Allen

TF
Esteemed
Arms
18,308
1,318
Gloucester
thought I'd be a little more specific with my questions andy

been trying to analyse my work practices to see if there is anything I can do to speed up but not compromise my quality

Fair nuff..
I do cuts as im going......small jobs ...15 m2 and below grout same day....muti rooms...do all the tiling then grout..:thumbsup:
 
C

charlie1

It's not about speed, it's efficiency! There are no doubt some real speed merchants on here who could easily tile a 20m2 bathroom in one day and you would think it's not possible. In reality you can easily tile a standard bathroom in one day quite easily. 1, do the right prep and know exactly what your tiling on to in terms of flatness, building tiles out will cost you time. 2, make all your walls plumb! You would think this will cost you time but it will actually save you time. 3, work clean and enjoy your work... The list goes on
 
J

Just Rizzle

if you want to be quick you need to be able to use rapid set adhesives. also know your strengths and weaknesses. look at modern ways of fixing. to day we tiled and grouted a 17 mtr sq floor using 600 by 600 porceline on a decoupling membrain we were able to do this by using weber spf rapid and by using the lash leveling system. and leveled a 20 mtr sq floor were doing tomorrow. started at 9 finished at 4
 
R

RDTiling

If you take on the suggestions given here and try them out you will soon find which method(s) is/are the most efficient for you, depedning on your room size.

For floors, I personally dry lay (including my cuts) either half (or the whole floor depending on size) and mix up a bigger adhesive mix and get tiling. I know of other more experienced tilers who are happy to have an adheive mix made up and cut as they go.

I saw from your other thread that you would take about 4 days to tile a bathroom. IMO there is nothing wrong with this, provided you are charging a square metre rate and not a day rate for the job. That way the customer isn't getting overcharged.

As others have said, the speed comes with experience, but it always has to be quality first.
 

Andy Allen

TF
Esteemed
Arms
18,308
1,318
Gloucester
If you take on the suggestions given here and try them out you will soon find which method(s) is/are the most efficient for you, depedning on your room size.

For floors, I personally dry lay (including my cuts) either half (or the whole floor depending on size) and mix up a bigger adhesive mix and get tiling. I know of other more experienced tilers who are happy to have an adheive mix made up and cut as they go.

I saw from your other thread that you would take about 4 days to tile a bathroom. IMO there is nothing wrong with this, provided you are charging a square metre rate and not a day rate for the job. That way the customer isn't getting overcharged.

As others have said, the speed comes with experience, but it always has to be quality first.

I would say its up to the customer to decide if he's overcharging. ....if he takes 4 days to do a quality job then charge for that....you never know you might charge the same and take 2 days.....dose that mean your overcharging. .? Imo its up to the client to do there homework and choose the best tiler for there project.....thats within there budget..:thumbsup:
 
C

charlie1

Most people want a good decent job done, this should in time not take you long if you work more methodically and efficient. You will slow down drastically when you start fussing about minimal tolerances that only a tiler would notice. Most people would not really know the difference between a good job and a near perfect job but to make a job near perfect takes so much more time. Especially if you would like to work for bathroom companies, they will be turning over a bathroom in a week generally giving the tiler a window of opportunity of 1-2 days, this is what IMO you should be aiming for. I'd say your speed is on the slow side for this type of work but I bet there loads of ways I could make you quicker if I was to come and watch you so don't worry. I will say again though, if you enjoy your work then who cares how long it takes, as long as it's a meter rate.
 
R

RDTiling

I would say its up to the customer to decide if he's overcharging. ....if he takes 4 days to do a quality job then charge for that....you never know you might charge the same and take 2 days.....dose that mean your overcharging. .? Imo its up to the client to do there homework and choose the best tiler for there project.....thats within there budget..:thumbsup:

When you put it like that.......!

Seriously though, I see where you are coming from. I'm honest with my customers and admit that I am newer to the tiling trade and as such jobs will take me longer than a more experienced tiler would take. So far its not caused any problems and the more I tile the quicker I get so hopefuly that won't be a factor for me much longer.
 

Reply to Advice to speed things up?? in the Australia Tiling Forum area at TilersForums.com

Make sure to mark a post as a solution for better transparency.

There are similar tiling threads here

Hello, I'm just a home owner who doesn't have much experience with tiling but I'm looking for advice on fixing a few problems that a professional left me with. He of course has not responded to...
Replies
12
Views
2K
  • Question
I have moved into a new house and want to tile the downstairs bathroom walls. Its not a big room but my wife likes the idea of a feature wall tile and then a grey / white tile on the other 3...
Replies
1
Views
522
  • Question
Hi all, I've laid some Arditex NA over the kitchen floor area (not under cabinets. The area is 4.5m x 1.8m. The top third of the room is totally level. The remainder of the room has a slope...
Replies
3
Views
1K
  • Question
I had a small leak in the main water line before the stop tap in my 1950s house. The copper pipe had worn away over the past 70 years, causing a small crack in the copper. A plumber/builder fixed...
Replies
1
Views
805
  • Question
Hi all, I am planning to tile a full height panel of split face tiles to sit 3” behind a log burner on a plaster render on blockwork wall. I’m planning to score and scrape the paint off the...
Replies
5
Views
1K
Posting a tiling question to the forum? Post in Tilers' Talk if you are unsure which forum to post in. We'll move it if there's a more suitable forum.

Advertisement

Birthdays

Top