Hi,
I have a slight problem on the job I'm starting next week, It's only a 4 mtr bathroom floor ,tiles going down are granite, floor is floor boards at the min with about 1 ft of concrete at the door way, floor has little movment when I jump on it. One of the problems is that when I lay my level across from side to side there is a dip in the middle of the floor around 1.5 inches! My plan was too over board with 6mm hardy , but I recon the dip will still be there. An ideas what the best way to solve this would be ? :mad2:
 
I

Ian

Get rid of deflection, then fit hardie, then SLC, the tile :thumbsup: I've had to do this recently, not 30mm but maybe half that, used weber floor flex.
 
2

2020Tiling

Problem is , I have to complete it in 1 day so slc may not be an option! could I just build up the tiles with spf after I have overboarded?
 
I

Ian

Problem is , I have to complete it in 1 day so slc may not be an option! could I just build up the tiles with spf after I have overboarded?

Even a thick bed adhesive won't be suitable for that depth, they can only deal with 25mm max. Why only one day? Can't you do the prep the evening before?
 
2

2020Tiling

Also before I over board the floor boards with 6mm hardy and spf, is it ok to fill all the gaps in the floor boards with silicone?
 

area tiling

TF
Arms
Reaction score
45
Points
513
Location
n.ireland
Use bal fibre base leveller , straight onto your floor boards . Making sure their deflection free and solid first ! When it dries after 4 hours it's just like a cement backer board and has the same strength as 15 mm wbp plywood , plus you'll have a level floor , and no awkward cutting around shower trays or pipe work !
bal reckon that one 20kg bag will do 4m2 , costs about £30 a bag!
 
I

Ian

They all do 4 m2 but at 3mm depth, it'll take a few bags to fill a 30/35mm dip. And that depth won't be tileable in 4 hours, it needs doing the day before.
 

area tiling

TF
Arms
Reaction score
45
Points
513
Location
n.ireland
No matter what you put down it will prob need to be done the nite before , just stating that even if it takes a few bags of fibre base it still would be a great option and faster !
 

Ajax123

TF
Esteemed
Arms
Reaction score
931
Points
1,213
Location
Lincolnshire
Problem is , I have to complete it in 1 day so slc may not be an option! could I just build up the tiles with spf after I have overboarded?

No !! It's not a one day job!! Do it right or do it again
 

Reply to uneven floor borards in the centre ? How too make level?? in the Canada Tile Advice area at TilersForums.com

Posting a tiling question to the forum? Post in Tilers' Talk if you are unsure which forum to post in. We'll move it if there's a more suitable forum.
Please visit our sponsor websites, they keep the forum free to use!

Advertisement

New Tiling Questions

Replies you've not seen

Top