Mtile89
-
Hi
I have ordered the Wunda Rapid Response underfloor heating for my kitchen.
We were going to have LVT flooring before but have now decided to have porcelain tiles.
I have looked at the forum and people are saying that In order to prevent the tiles to break or crack, the surface needs to be fully prepared with levelling compound and some 4mm tile backer boards. Even though wunda said we can tile straight on top of their system.
I have no idea about this stuff as I have zero experience in this field. Can someone advise me what to do in order to prevent cracks or breaks of my tiles. So this information I can relay to a tiler I get to do my flooring.
I have ordered the Wunda Rapid Response underfloor heating for my kitchen.
We were going to have LVT flooring before but have now decided to have porcelain tiles.
I have looked at the forum and people are saying that In order to prevent the tiles to break or crack, the surface needs to be fully prepared with levelling compound and some 4mm tile backer boards. Even though wunda said we can tile straight on top of their system.
I have no idea about this stuff as I have zero experience in this field. Can someone advise me what to do in order to prevent cracks or breaks of my tiles. So this information I can relay to a tiler I get to do my flooring.