Search the forum,

Discuss Slurry Mix Only 3 hours work time? in the DIY Tiling Forum area at TilersForums.com.

Reaction score
2
Points
108
Location
South Yardley Birmingham
I have a slurry mix I bought for my porcelain tile job. I am a novice but see the slurry mix is workable for around 3 hours. I have about 44 60x60cm tiles to lay on mortar bed. I would guess it take me a lot longer than 3 hours though so would you mix a third at a time. My slurry mix is 17kg bag supplied in bucket ready for self mixing. Please advise, thanks
 

Reply to Slurry Mix Only 3 hours work time? in the DIY Tiling Forum area at TilersForums.com

There are similar tiling threads here

Hi! I'm looking for some advice, I have laid some SLC (Mapei 1210) in our conservatory in...
Replies
5
Views
556
    • Like
Bathroom floor. I would be grateful for advice on how to prepare my bathroom sub floor ready for...
Replies
1
Views
419
Good morning all. After a little advice. I'll post pictures a bit later. However.... The...
Replies
6
Views
767
The trustpilot reviews for tilers-world are excellent, but there's not a huge number of them...
Replies
3
Views
914
I had a small leak in the main water line before the stop tap in my 1950s house. The copper pipe...
Replies
1
Views
605

Advertisement

New Tiling Questions

Replies you've not seen

Top