Search the forum,

Discuss Floor prep question in the America Tile Forum area at TilersForums.com.

9
278
Hi everyone,
I'm pricing a job to tile a bathroom floor with UFH. It's a suspended floor that has been over-boarded with ply and has a thick, hard shiny vinyl on top.
Everything is well fix down and I'd rather not remove it all if possible as it goes under furniture that they don't want to remove. So I'm wondering whether I could glue and screw wedi board over this and if so what people's thoughts were on what adhesive to use? Maybe sticks like sh*t?
 

Ajax123

TF
Esteemed
Arms
931
1,213
Lincolnshire
the screws hold it down so your wedi board should be mechanically fixed with screws and washers ideally into the structural subfloor i.e. the joists, and not just the floor boards. The tile adhesive helps keep it stuck but is primarily there to fill any voids underneath to prevent flexing. One important thing on a floor like this is that there needs to be no flexing in the joists as that will pop/crack your tiles
 

Reply to Floor prep question in the America Tile Forum area at TilersForums.com

There are similar tiling threads here

    • Like
Hi, Can't seem to find a solid answer as I realise so much depends on multiple factors. I'm...
Replies
0
Views
2K
    • Like
https://www.tilersforums.com/threads/shower-bath-tiling-preparation-plaster-and-wooden-windowsill...
Replies
1
Views
218
    • Like
  • Sticky
Water Damaged Shower Repairs Shower tile repair – water damage – tile waterproofing Do you...
Replies
0
Views
2K

Advertisement

Replies you've not seen

Top