Search the forum,

Discuss Show Us YOUR Work Thread - Tilers Pictures in the UK Tiling Forum area at TilersForums.com.

Status
Not open for further replies.

Mouldy

TF
Arms
Reaction score
21
Points
553
Location
Park Gate
Heres a few of my latest:-

Peters Rd before.jpg Peters Rd during.jpg Peters Rd Finished.jpg
 
Last edited:
S

Stewart

One of the floors i did this week.
18mm ply, insulated backer board, 200 watt heatmat, Nicobond 2 part screed, Dural CI stuck with Nicobond Rapidflex, 40 square metres of Edimax 450 x 750 porcelain tiles stuck with Nicobond Rapidflex and grouted with Nicobond silver grey.
IMG_0734.jpg IMG_0773.jpg
IMG_0780.jpg IMG_0785.jpg
IMG_0784.jpg IMG_0784.jpg
IMG_0790.jpg IMG_0791.jpg
IMG_0797.jpg IMG_0836.jpg
IMG_0825.jpg IMG_0837.jpg
IMG_0811.jpg IMG_0830.jpg
IMG_0838.jpg IMG_0840.jpg
IMG_0819.jpg IMG_0831.jpg
 

Attachments

  • IMG_0788.jpg
    354 KB · Views: 82
M

marktiling

Second attempt !
Basalt job from last week - 2 pics
 

Attachments

  • Basalt pic 2.jpg
    98.2 KB · Views: 64
  • Basalt pic 1.jpg
    109.2 KB · Views: 59
M

marktiling

And a few weeks ago - 3 floors
 

Attachments

  • B bathroom 1 floor l.jpg
    59.7 KB · Views: 70
  • B Bathroom 2 floor 1.jpg
    70.7 KB · Views: 64
  • B toliet floor 1.jpg
    73.3 KB · Views: 73
T

tfs

How to repair a damaged door jam (forced open)

Nothing fancy here at all but demonstrates how to make the repair using my fein to cut out timber and chisel to cut recess for keeper.

Old keeper and facing were put back on, personally I would liked to have replaced.

I you ever make any repairs to wood and need to use a filler I reccomend using metolux Metolux - Products For the Trade Professional this is a 2 part filler that sets in approx 15-20 minutes depending on temp etc. It can be shaped and even staind to match existing timbers both colour and profile. You get the job done quicker instead of using DIY fillers which can take 24hours.

You will also notice the size of the peice of timber I cut out, it was much larger than what was actualy damaged. This is to ensure that the new peice is fixed solid to the existing timber. If you only cut out a small sections then this can be easily forced open . Its probs more important to take this into account if you are making a simliar type of repair to an external door.
 

Attachments

  • damaged door jam 1.jpg
    96.1 KB · Views: 78
  • damaged door jam 2.jpg
    101.6 KB · Views: 77
  • close up of cut out.jpg
    97.1 KB · Views: 79
  • cut out damaged timber 2.jpg
    79.7 KB · Views: 71
  • chiseled recess for keeper.jpg
    92.5 KB · Views: 72
  • door working again.jpg
    100.7 KB · Views: 70
  • old keeper and facing put back on as requested.jpg
    102.4 KB · Views: 67
Last edited by a moderator:

Mouldy

TF
Arms
Reaction score
21
Points
553
Location
Park Gate
Heres one that got finished today. Been an absolute PITA!!!!!
 

Attachments

  • Burnt House Lane.jpg
    104.6 KB · Views: 128
  • Burnt House Lane Finished.jpg
    72.3 KB · Views: 113
  • Burnt House Lane Detail.jpg
    66.5 KB · Views: 104
Last edited:
Status
Not open for further replies.

Reply to Show Us YOUR Work Thread - Tilers Pictures in the UK Tiling Forum area at TilersForums.com

There are similar tiling threads here

    • Like
I spend some time in doorways. NOTE THAT DAN HAS CREATED THIS NEW 2024 SHOW US YOUR TILE...
Replies
23
Views
1K
Posting a tiling question to the forum? Post in Tilers' Talk if you are unsure which forum to post in. We'll move it if there's a more suitable forum.
Please visit our sponsor websites, they keep the forum free to use!

Advertisement

New Tiling Questions

Replies you've not seen

Top