Discuss Wetroom floor levelling problem in the Canada area at TilersForums. The USA and UK Tiling Forum (Also now Aus, Canada, ROI, and more)

Reaction score
1
The wetroom I am about to start building has a floor area 900 x 1850. The former is a GRP 900 x 1400 x 22 so I need to fill the 450 x 900 space at the end of the former. I considered putting a 9mm ply base down with 12.5mm backer board over the top which will bring the level up to within 0.5mm. The area that I have to raise is in front of the basin so will take a fair amount of standing on and I am concerned that the backer will eventually compress a bit or the whole thing flex. I intend to put mapiband tape across the former/backer junction then Schulter Kerdi membrane over the entire floor area. Any suggestions about a better way of filling the 450 x 900mm space gratefully received.
 

Albert

TF
Esteemed
Arms
Reaction score
9,515
The wetroom I am about to start building has a floor area 900 x 1850. The former is a GRP 900 x 1400 x 22 so I need to fill the 450 x 900 space at the end of the former. I considered putting a 9mm ply base down with 12.5mm backer board over the top which will bring the level up to within 0.5mm. The area that I have to raise is in front of the basin so will take a fair amount of standing on and I am concerned that the backer will eventually compress a bit or the whole thing flex. I intend to put mapiband tape across the former/backer junction then Schulter Kerdi membrane over the entire floor area. Any suggestions about a better way of filling the 450 x 900mm space gratefully received.
You could go with 2, 10mm backer boards with 2mm of tile adhesive between
 
Q

Qwerty

You would be far better off bracing between the joists with noggins to firm it all up, and lay hardifloor 22mm. Either that or 18mm WBP ply then 4mm waterproof backerboard.

I am assuming it is on a suspended floor of course!
 
Reaction score
1
Yes it is suspended. I had an alternative thought. I have some fairly extensive levelling to do so whilst I am about it I could simply raise the last 450mm up by 4mm relative to the rest. I could then put in a section of 18mm ply, seal it then fleece over the lot.
 

Reply to Wetroom floor levelling problem in the Canada area at TilersForums.com

Or checkout our tile courses and training forum or the Tile Blog / Latest Blog Posts

This website is hosted and managed by www.untoldmedia.co.uk. Creating content since 2001.
Please visit our sponsor websites, they keep the forum free to use!
Tile Contractor Forum. The useful tile contractor website.

UK Tiling Forum Stats

Threads
67,337
Messages
881,120
Members
9,530
Latest member
Northern Tiler
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock    No Thanks