Discuss Tiling Standards (BS 5385) | British Wall and Floor Tiling Standards - IN FULL in the UK Tiling Forum area at TilersForums. The USA and UK Tiling Forum (Also now Aus, Canada, ROI, and more)

Boggs

TF
Esteemed
Arms
Reaction score
4,729
You would think, however they all think he has done a great job

If you can produce work to that standard and get a pat on the back I am going to work for them.
 
I

Italy

Sorry, bit late to the party on this one, but here goes:

BS5385 part 1-2018 - 7.1.5 Setting out
Unsightly cut tiles should be avoided
and joints should be of a uniform width, true to a line, continuous without steps: allowance should be made for an adequate width of joint. Cut course, both vertical and horizontal, should be:
a) kept to a minimum
b) determined in advance
c) as large as possible

d) arranged in the least prominent locations

Where wall surfaces are interrupted by features, e.g. windows, access panels or sanitary fittings, the tile fixer should seek guidance from the designer as to the setting out to be adopted; similar guidance might be required in the positioning of movement joints, since they are predominant and could determine the setting out pattern.

Horizontal joints and cut courses should be positioned depending on several factors, of which the following are examples.
1) Tiled areas that adjoin or are adjacent should be set out so that horizontal joints are aligned
2) The upper and/or lower extremities of the wall might not be level, requiring a course or courses to be cut with a raking edge. Wherever possible, the horizontal joints should be positioned so that the whole of the rake can be taken up within the height of the tile in the cut course.
3) If it is thought desirable to align a joint with a feature, this becomes the setting out point and might initiate the need for, and frequently dictate the location of, cut courses elsewhere.
4) To ensure the rows are truly horizontal, a level line should be established to position the starting course. This line should be continuous across all tile surfaces.
should, could, where possible.......
seems very vague
very different from uni standards.
they must be is better than they should.
or is the translator wrong?
 

Balloo

TF
Esteemed
Arms
Reaction score
132
I'm pretty sure that it's not in British standards to start a full tile from the bath. @Paul C. Could confirm this.
The transitions should be a silicone joint which should be in British standards. It's a bad job and I think they're lying about the B. S.
Absolutely nonsense and misinformation BS is not a about that , its only a guideline for standard practice .
 

Balloo

TF
Esteemed
Arms
Reaction score
132
I look at all trades and the crap they dish out , and a tiler is caught out by a crap ceiling not level nor probably walls plumb , and the whole world condemns the job .
take a look at yourselves is this really worth a dispute .
ok he should have checked the cuts to ceiling but seriously some of the dib and dab jobs on floors is more significant obviously because of the cost of fixing broken tiles.
 
H

hmtiling

I look at all trades and the crap they dish out , and a tiler is caught out by a crap ceiling not level nor probably walls plumb , and the whole world condemns the job .
take a look at yourselves is this really worth a dispute .
ok he should have checked the cuts to ceiling but seriously some of the dib and dab jobs on floors is more significant obviously because of the cost of fixing broken tiles.
I certainly wouldn't let it slide if it was my house. Are you saying you would?
 
T

Tile Shop

I look at all trades and the crap they dish out , and a tiler is caught out by a crap ceiling not level nor probably walls plumb , and the whole world condemns the job .
take a look at yourselves is this really worth a dispute .
ok he should have checked the cuts to ceiling but seriously some of the dib and dab jobs on floors is more significant obviously because of the cost of fixing broken tiles.

"Caught out".... He wouldn't have been if he'd planned it correctly instead of being lazy and assuming a full tile from a convenient point would be ok. Setting out and good preparation is a tilers job, part of the service. Either the ceiling could have been sorted, tiles laid out to suit a bigger cut and less of an eye-sore, or have a discussion with the customer how to proceed, stick it in their court... Not wing it and say "sorry, best I could do".

So taking a look at myself as you asked and yes, I would still dispute. It looks arse. Aside from practicality, aesthetics is a huge part of why tiles are used. And that is certainly not aesthetically pleasing to me.
 
Reaction score
12
I'm guessing the installer was on a price or on a time...I've always taken my time setting out purposely to avoid problems like this..if you've got a room with a bath, couple of windows and maybe a shower tray then it can take a while to get your head round how it's going to work out and I always discuss the layout with the client beforehand to make sure they're happy before I start fixing
 

acaciaguy

TF
Arms
Reaction score
388
I'm guessing the installer was on a price or on a time...I've always taken my time setting out purposely to avoid problems like this..if you've got a room with a bath, couple of windows and maybe a shower tray then it can take a while to get your head round how it's going to work out and I always discuss the layout with the client beforehand to Makel sure they're happy before I start fixing


Fully agree Tim. I find it the most interesting / stressful part. Especially with small tiles. Take your time. Check and re check and it works out fine. Also. There is usually a compromise somewhere. As you say check with client. Get them to sign off on all final decisions
 

Reply to Tiling Standards (BS 5385) | British Wall and Floor Tiling Standards - IN FULL in the UK Tiling Forum area at TilersForums.com

Or checkout our tile courses and training forum or the Tile Blog / Latest Blog Posts

This website is hosted and managed by www.untoldmedia.co.uk. Creating content since 2001.
Tile Contractor Forum. The useful tile contractor website.

UK Tiling Forum Stats

Threads
67,336
Messages
881,102
Members
9,527
Latest member
voltage2688
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock    No Thanks