Discuss Tile over new concrete in the America area at TilersForums. The USA and UK Tiling Forum (Also now Aus, Canada, ROI, and more)




Reaction score
0
Am re-routing roughed in basement drain about 4 ft. for shower vs original rough in for bathtub.
To do so, am smashing concrete and creating an opening about 10" wide and 4 ft long. After installing abs and p trap, will replace removed removed sand and then, concrete with likely Quickrete from Home Depot. Bathroom floor is 65 SF and New concrete mix will be a strip 4" thick about 4 ft long.
Here is question:
Must new concrete cure 28 days before applying ceramic/porcelain tile, and can thinset be placed over finished floor without concrete Sakrete adhesive?
Many thanks for help.






 

Reply to Tile over new concrete in the America area at TilersForums.com

Or checkout our tile courses and training forum or the Tile Blog / Latest Blog Posts

This website is hosted and managed by www.untoldmedia.co.uk. Creating content since 2001.



Tile Contractor Forum. The useful tile contractor website.

New Tiling Questions

UK Tiling Forum Stats

Threads
67,360
Messages
881,162
Members
9,532
Latest member
Matthew77
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock    No Thanks