Discuss Preparing concrete path for tile in the America area at TilersForums. The USA and UK Tiling Forum (Also now Aus, Canada, ROI, and more)




Reaction score
0
Hi everyone,
I'm a competent DIYer and have tiled a couple of bathrooms and recently my kitchen. They've all come out very well - however, I have a friend that wants me to tile their path and I'm not sure which course of action to take in preparing it. You can see in the photo that it has exposed aggregate, is quite bumpy etc. We are going to edge it with Victorian rope edging which will give crisp sides. Could it be skimmed with adhesive? Screed? Mesh or uncoupling mat? Back buttered tiles? The tiles are porcelain rated for external use and I'll use S1 adhesive. I want to take this project on but want to do it properly, first time. (Picture taken for example the tiles are not lined up properly for laying)
Many thanks in advance
 

Attachments

  • 20220505_182508.jpg
    725.5 KB · Views: 25
Reaction score
0
I would use Tilemaster External leveller or another external leveller first and make sure you get 100% coverage on the tiles.
Thanks for your input, does seem like the more professional route - my only concern is losing any fall and water potentially pooling ? But external self levelling will definitely make laying tile easier
 

Reply to Preparing concrete path for tile in the America area at TilersForums.com

Or checkout our tile courses and training forum or the Tile Blog / Latest Blog Posts

This website is hosted and managed by www.untoldmedia.co.uk. Creating content since 2001.



Tile Contractor Forum. The useful tile contractor website.

UK Tiling Forum Stats

Threads
67,337
Messages
881,117
Members
9,529
Latest member
Finias Coroama
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock    No Thanks