Discuss Floor to wall tiling in the Canada area at TilersForums. The USA and UK Tiling Forum (Also now Aus, Canada, ROI, and more)




serval

TF
Reaction score
13
Going to be tiling a small cloak room floor and a wall plus boxed in cistern/ pipe work.
15661248388914803699.jpg


Ive tiled plenty of walls before but this will be my first attempt at doing the floor.
Im assuming that do the floor first and then overlap the wall tiles on top of the floor tiles?
A few other questions you guys might be able to help with.

The bathroom gets quite cold in winter as its on an external wall. Is there anything i can put down to try and insulate the tiles from being vert cold?

What sort of gap do you need to leave between the floor tiles and the walls

Also do you use grout at the joint between floor and wall tile or some sort of flexible sealant.
 
W

WetSaw

UFH will stop the tiles feeling cold!
Some people tile the walls first leaving out the bottom row, then the floor and finally cut in the bottom row of wall tiles. I usually tile the floor first then do the walls. 2mm gap between wall and floor siliconed.
 

Reply to Floor to wall tiling in the Canada area at TilersForums.com

Or checkout our tile courses and training forum or the Tile Blog / Latest Blog Posts

This website is hosted and managed by www.untoldmedia.co.uk. Creating content since 2001.



Tile Contractor Forum. The useful tile contractor website.

New Tiling Questions

UK Tiling Forum Stats

Threads
67,360
Messages
881,162
Members
9,532
Latest member
Matthew77
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock    No Thanks