- Reaction score
- 71
I have a customer who wishes to tile their entire first floor over wet underfloor heating.
The ufh is between joists, with a biscuit screed on top. How would you guys then prepare this to be tiled?
Whole area is approx 80m - 4 bedrooms, 2 bathrooms and landing. Tile will be a porcelain plank - 900 x 225.
I am supplying tiles - not tiling it - I leave the skilled stuff to the experts, but I want to ensure that customer has a trouble free installation.
The ufh is between joists, with a biscuit screed on top. How would you guys then prepare this to be tiled?
Whole area is approx 80m - 4 bedrooms, 2 bathrooms and landing. Tile will be a porcelain plank - 900 x 225.
I am supplying tiles - not tiling it - I leave the skilled stuff to the experts, but I want to ensure that customer has a trouble free installation.