Discuss BS 5385:Part 4 - 2 wks before use shower?? in the UK Tiling Forum area at TilersForums. The USA and UK Tiling Forum (Also now Aus, Canada, ROI, and more)

R

Ray

:huh2:I know that after tiling and grouting a shower BS recommend not using shower for 2 weeks to comply with BS 5385:part 4:2009, clause 7.2.1..
DOES anyone know why. Adhesive is dry and grout is dry (manufacturer recommended times ) usually 24hours +. What takes 2 weeks.?
:lol:
 
D

DHTiling

:huh2:I know that after tiling and grouting a shower BS recommend not using shower for 2 weeks to comply with BS 5385:part 4:2009, clause 7.2.1..
DOES anyone know why. Adhesive is dry and grout is dry (manufacturer recommended times ) usually 24hours +. What takes 2 weeks.?
:lol:


Tensile/structural strength..
 
W

White Room

Cement adhesive may have set but need's the time then to cure to give their full strength, thats why 2-4 weeks
 
R

Ray

Thanks guys...Now I know why i am telling clients not to use shower for 2 weeks..They are often dissapointed when all is finnished and i say can't use shower.
 

Reply to BS 5385:Part 4 - 2 wks before use shower?? in the UK Tiling Forum area at TilersForums.com

Or checkout our tile courses and training forum or the Tile Blog / Latest Blog Posts

This website is hosted and managed by www.untoldmedia.co.uk. Creating content since 2001.
Tile Contractor Forum. The useful tile contractor website.

UK Tiling Forum Stats

Threads
67,337
Messages
881,117
Members
9,529
Latest member
Finias Coroama
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock    No Thanks