Al was an absolute legend taking a look
Over it at the weekend! It all needs to come up but I can’t afford take 2 to go wrong and need to Tick every box to make sure it remains solid and warm!
Hi all thanks for your expertise, I think the boards are delta 60mm construction, they were apparently bonded to the concrete DPM. The original floor was ripped out due to a water leak and i am wondering if the concrete was still damp.
it was set to be at 24 degrees and a minimum of 17 degrees when commissioned the thermostat said the floor was at 22 degrees ambient. the floor heating wasn't on 24 hours.
Hi everyone,
I had my floor ripped up after a leak two years ago and wanted to get UFH heating system in my kitchen. The kitchen units were not removed but the floor around was back to original concrete base (house circa 1880). see pictures
I wanted to maintain the original height of the floor...
Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.