Ok, before i start, I totally misread (as in missed!) the priming instructions on the Mapei 1210 SLC and didn't prime my floor before adding the SLC in my understairs toilet
Anyway, I poured the well and correctly mixed SLC over old black tile https://www.tilersforums.com/forums/tile-adhesive/ and everything thus far seems ok! The old https://www.tilersforums.com/forums/tile-adhesive/ was tested for Asbestos and came back positive but was in a good state, not tacky and very very thin.
It's been 72 hours since the pour and the SLC is sound and i haven't noticed any cracks or hollow sounds upon tapping. I know I've messed up but i wanted to know how long will it be before the floor fails, if it is to fail.
Thanks in advance!
Anyway, I poured the well and correctly mixed SLC over old black tile https://www.tilersforums.com/forums/tile-adhesive/ and everything thus far seems ok! The old https://www.tilersforums.com/forums/tile-adhesive/ was tested for Asbestos and came back positive but was in a good state, not tacky and very very thin.
It's been 72 hours since the pour and the SLC is sound and i haven't noticed any cracks or hollow sounds upon tapping. I know I've messed up but i wanted to know how long will it be before the floor fails, if it is to fail.