Tile Forum | America Tile Forum

Welcome to America Tile Forum, the USA Tile Industry. The Tile Association of America.

Discuss Show Us YOUR Work Thread - Tilers Pictures in the UK Tiling Forum area at TilersForums. The USA and UK Tiling Forum (Also now Aus, Canada, ROI, and more)

Reaction score
4
Nice work there kilty and blocko very nice jobs and yes blocko just a slight improvement on that last one haha. I'm on travertine job at the moment I'll post some pictures when it's finished but I don't really like the colours in the stone it's a bit dark but it's supposed to be light if you know what I mean
 
Q

Qwerty

Nice bathroom Geoff. I'll bet the customers were pleased with the result especially looking at the old room. Do you mind my asking how long that job took?

9 days start to finish. Problem was that it was the only bathroom in the house and it was a family of 4 adults. Rip out only took 3 hours...... The tiled bath wall fell on me in one whole sheet!!!! Just as well I was fitting a new bath!
 
J

jonnyc

ASHLEYBROADWATER 019.jpg ASHLEYBROADWATER 009.jpg ASHLEYBROADWATER 014.jpg ASHLEYBROADWATER 002.jpg ASHLEYBROADWATER 016.jpg ASHLEYBROADWATER 007.jpg this is a job for one of most regular contractor clients.
230.00 sq mts mts polished 610 x 406 on walls
150.00 sq mts polished 610x610 ground floor.,
80.00 sq mts brushed repeat module round pool /changing.
2 seta polished marble staircases.
stairs/copings were templated ,cut, finished polished on site by us.

140.00 man days for whole job
 

martin1c

TF
Arms
Reaction score
91
9 days start to finish. Problem was that it was the only bathroom in the house and it was a family of 4 adults. Rip out only took 3 hours...... The tiled bath wall fell on me in one whole sheet!!!! Just as well I was fitting a new bath!

9 days for that kind of quality is going some. Well done. I've got a similar one next week, only one bathroom in the house so I have to re-install the WC at the end of each day.
 
Q

Qwerty

9 days for that kind of quality is going some. Well done. I've got a similar one next week, only one bathroom in the house so I have to re-install the WC at the end of each day.

I had my spark do all electrical related work, plasterer skim ceiling, a willing labourer to help with lugging bits and painting of ceiling. I did motor on with it though....... totally knackered at the end!!! Mostly 10-12 hour days!
 

Furtek

TF
Reaction score
0
Hi Guys! The latest work has just finished.On the right side of the wall will be installed big mirror.


 

Attachments

  • IMAG0285.jpg
    68.4 KB · Views: 43
  • IMAG0289.jpg
    91 KB · Views: 49
  • IMAG0290.jpg
    80.3 KB · Views: 49
  • IMAG0291.jpg
    106 KB · Views: 47
  • IMAG0293.jpg
    54.6 KB · Views: 47
  • IMAG0294.jpg
    114.5 KB · Views: 44
  • IMAG0295.jpg
    75.3 KB · Views: 45
  • IMAG0296.jpg
    64.9 KB · Views: 42
  • IMAG0297.jpg
    70.7 KB · Views: 42

kilty55

TF
Arms
Reaction score
9
the italian job at xmas bathroom in grey polished porc,dining room,hall and kitchen floor in jakarta black and walls in glass mosaic
 

Attachments

  • DSCF1654 (907 x 1209).jpg
    225.7 KB · Views: 43
  • DSCF1656 (1209 x 907).jpg
    219.9 KB · Views: 42
  • DSCF1657 (1209 x 907).jpg
    265.6 KB · Views: 44
  • DSCF1658 (1209 x 907).jpg
    228.9 KB · Views: 43
  • DSCF1659 (907 x 1209).jpg
    205.7 KB · Views: 42
  • DSCF1663 (1209 x 907).jpg
    219.2 KB · Views: 47
  • DSCF1664 (1209 x 907).jpg
    244.1 KB · Views: 44
  • DSCF1665 (1209 x 907).jpg
    259.1 KB · Views: 46
  • DSCF1667 (1209 x 907).jpg
    327.4 KB · Views: 51
  • DSCF1671 (907 x 1209).jpg
    206.3 KB · Views: 47
  • DSCF1675 (1209 x 907).jpg
    202.4 KB · Views: 48
  • DSCF1676 (907 x 1209).jpg
    207.9 KB · Views: 47
  • DSCF1678 (1209 x 907).jpg
    224 KB · Views: 45
  • DSCF1679 (907 x 1209).jpg
    184.6 KB · Views: 44
  • DSCF1682 (907 x 1209).jpg
    204.9 KB · Views: 46
  • DSCF1677 (1209 x 907).jpg
    251.4 KB · Views: 46

Tony73

TF
Arms
Reaction score
70
here i finished bathroom and shower room today, and yes mitred external corners (with Mitre Wizz) :smilewinkgrin:

DSC_0263.jpg DSC_0264.jpg DSC_0265.jpg DSC_0266.jpg DSC_0267.jpg DSC_0268.jpg DSC_0269.jpg DSC_0270.jpg DSC_0271.jpg DSC_0272.jpg DSC_0273.jpg DSC_0274.jpg DSC_0275.jpg DSC_0276.jpg DSC_0277.jpg DSC_0278.jpg DSC_0279.jpg DSC_0280.jpg DSC_0281.jpg DSC_0282.jpg DSC_0283.jpg DSC_0284.jpg DSC_0285.jpg DSC_0286.jpg DSC_0287.jpg
 

John Benton

TF
Arms
Reaction score
2,214
Hi Tony! like it a lot ! Just wonder... what for you got this masking tape around boxing in third pic ?

He's covering up all the chips the Mitre Wizz leaves behind :smilewinkgrin:
 

Reply to Show Us YOUR Work Thread - Tilers Pictures in the UK Tiling Forum area at TilersForums.com

Or checkout our tile courses and training forum or the Tile Blog / Latest Blog Posts

This website is hosted and managed by www.untoldmedia.co.uk. Creating content since 2001.
Tile Contractor Forum. The useful tile contractor website.

UK Tiling Forum Stats

Threads
67,371
Messages
881,208
Members
9,534
Latest member
Lowpaul22
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock    No Thanks